HS2 contractor Armac has removed the 4000-tonne M42 bridge to make way for the construction of the new high-speed line in Solihull, UK.
507 views
HS2 contractor Armac has removed the 4000-tonne M42 bridge to make way for the construction of the new high-speed line in Solihull, UK.