HS2 receives Schedule 17 planning approval for a 150m Curzon no.2 Viaduct carrying trains into Birmingham’s Curzon Street Station.
Tag: UK
HS2 reveals Thame Valley Viaduct will be manufactured off-site
2131 views
HS2: PACADAR UK will manufacture every major element of the Thame Valley Viaduct at its factory on the Isle of Grain.
HS2 removes 10 million tonnes of materials from rail construction sites
2132 views
HS2 have removed 10 million tonnes of material from construction sites, reaching the target of cutting carbon emissions ahead of schedule.
HS2: first concrete pour in West London complete
2199 views
HS2’s Old Oak Common station continues to take shape as workers complete the first base slab concrete pour in West London.
National Highways demolish old Solihull Road bridge for £282m M42 upgrade
2167 views
Specialist teams demolish the old Solihull Road bridge as part of the £282m M42 junction 6 major upgrade scheme in the UK.
RICS UK releases reports on workloads, labour, finance, and materials in construction
2155 views
RICS UK Construction Monitor reports that construction workloads are rising, whereas labour, finance, and material shortages remain a concern.
HS2 trials world’s first hydrogen dual-fuel piling rig on London site
2331 views
HS2 has completed a world first hydrogen dual-fuel piling rig to achieve an average fuel displacement of 36%.
Katy Dowding appointed President and CEO for Skanska UK
2166 views
Newly appointed President and CEO Katy Dowding to take over Skanska UK in May 2023 following the retirement of Gregor Craig.
HS2’s 345m Small Dean Viaduct given green light
2255 views
HS2’s 345m Small Dean Viaduct design has been given the green light, as construction continues to ramp up on UK’s high speed railway.
Low carbon concrete to become standard on all Laing O’Rourke UK projects
2282 views
Laing O’Rourke will switch to low-carbon concrete on all of its new UK projects to accelerate towards its net zero targets.
HS2’s third tunnelling machine launches in London
2273 views
HS2 launches third tunnelling machine to deliver construction materials and remove spoil from the northern portal in London.
HS2 completes 200m porous portal for the 700m Burton Green Tunnel
2295 views
HS2’s main works contractor installs over 160 roof segments as part of the 200m porous portal for the Burton Green Tunnel near Kenilworth.













